{"id":3038,"date":"2018-10-17T13:02:53","date_gmt":"2018-10-17T13:02:53","guid":{"rendered":"https:\/\/investinpomerania.pl\/?p=3038"},"modified":"2018-10-17T13:08:30","modified_gmt":"2018-10-17T13:08:30","slug":"new-building-of-the-faculty-of-mathematics-physics-and-it-is-on-the-rise","status":"publish","type":"post","link":"https:\/\/investinpomerania.pl\/en\/news\/new-building-of-the-faculty-of-mathematics-physics-and-it-is-on-the-rise\/","title":{"rendered":"New building of the Faculty of Mathematics, Physics and IT is on the rise"},"content":{"rendered":"<p><strong>The building of\u00a0Faculty of Mathematics, Physics and IT \u00a0is being built on the UG campus in Gda\u0144sk Oliwa. The investment is co-financed under the Regional Operational Program of the Pomorskie Voivodeship for the years 2014-2020, and its completion is scheduled for the second half of 2019. On October 15th, with the participation of invited guests, a solemn laying of the foundation act was held.<\/strong><\/p>\n<p>The total net area of the building is approx. 3912 m2, including a volume of 22 678 m3. There will be five storeys of the building, with one located underground. The facility will be connected to the existing building of the Faculty with a link at the level of the second and third floors. Moreover, the seminar and computer rooms, auditoria, didactic and scientific rooms as well as office and social rooms are planned in the building.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>The new faculty building is intended primarily for the field of practical IT, which will be opened thanks to the possibilities offered by the new infrastructure.<\/p>\n<p>\u2013\u00a0I hope that the construction of the building of the Institute of IT at the Faculty of Mathematics, Physics and IT of the University of Gda\u0144sk will prove to be a perfect response to the needs of the labor market with its still high demand for<br \/>\nIT specialists\u00a0\u2013 says Prof. Jerzy Piotr Gwizda\u0142a, Rector of the University of Gda\u0144sk<\/p>\n<p>The building contractor selected in a public tender is Korporacja Budowlana DORACO Sp. z o.o.<\/p>\n<p>The investment is planned to be completed in the second half of 2019. The value of investment outlays necessary to implement the project amounts to over\u00a0 39 million PLN. The University of Gda\u0144sk received funding for the project within the framework of the Regional Operational Program of the Pomorskie Voivodeship for the years 2014 &#8211; 2020 in the amount of over PLN 21 million, the remaining part in the amount of PLN 18 million is the own contribution of the university. The partner of the project is also Kainos Software Poland Sp. z o.o.<\/p>\n<h4>About the Faculty<\/h4>\n<p>Currently, over 1,200 students study at the Faculty of Mathematics, Physics and Computer Science. The Faculty offers education in 7 fields of study, postgraduate and doctoral studies. In addition to the fields of study, such as Mathematics, Physics and Computer Science, the department offers interdisciplinary studies in the field of medical physics, nuclear safety and radiological protection as well as mathematical modeling and data analysis.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The building of\u00a0Faculty of Mathematics, Physics and IT \u00a0is being built on the UG campus in Gda\u0144sk Oliwa. The investment is co-financed under the Regional Operational Program of the Pomorskie Voivodeship for the years 2014-2020, and its completion is scheduled for the second half of 2019. On October 15th, with the participation of invited guests, [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":3032,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[3],"tags":[],"yst_prominent_words":[458,452,446,464,448,444,451,465,462,466,457,454,460,463,455,447,461,456,459,450],"acf":[],"_links":{"self":[{"href":"https:\/\/investinpomerania.pl\/en\/wp-json\/wp\/v2\/posts\/3038\/"}],"collection":[{"href":"https:\/\/investinpomerania.pl\/en\/wp-json\/wp\/v2\/posts\/"}],"about":[{"href":"https:\/\/investinpomerania.pl\/en\/wp-json\/wp\/v2\/types\/post\/"}],"author":[{"embeddable":true,"href":"https:\/\/investinpomerania.pl\/en\/wp-json\/wp\/v2\/users\/19\/"}],"replies":[{"embeddable":true,"href":"https:\/\/investinpomerania.pl\/en\/wp-json\/wp\/v2\/comments\/?post=3038"}],"version-history":[{"count":7,"href":"https:\/\/investinpomerania.pl\/en\/wp-json\/wp\/v2\/posts\/3038\/revisions\/"}],"predecessor-version":[{"id":3047,"href":"https:\/\/investinpomerania.pl\/en\/wp-json\/wp\/v2\/posts\/3038\/revisions\/3047\/"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/investinpomerania.pl\/en\/wp-json\/wp\/v2\/media\/3032\/"}],"wp:attachment":[{"href":"https:\/\/investinpomerania.pl\/en\/wp-json\/wp\/v2\/media\/?parent=3038"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/investinpomerania.pl\/en\/wp-json\/wp\/v2\/categories\/?post=3038"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/investinpomerania.pl\/en\/wp-json\/wp\/v2\/tags\/?post=3038"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/investinpomerania.pl\/en\/wp-json\/wp\/v2\/yst_prominent_words\/?post=3038"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}